GOAA ITF/PDL   Construction surveying contract with the CM@R for the Greater Orlando Aviation Authority Intermodal Terminal Facility and Passenger Drop-Off Lobby.  L & S was hired to make sure the sub-contractors kept inline with the high accuracy standards of the aviation authority.

GOAA ITF/PDL

Construction surveying contract with the CM@R for the Greater Orlando Aviation Authority Intermodal Terminal Facility and Passenger Drop-Off Lobby.

L & S was hired to make sure the sub-contractors kept inline with the high accuracy standards of the aviation authority.

Albany Bahamas   L & S’s core team has been involved with the design and construction of the Albany Bahamas project since 2006. We pride ourselves on building lasting relationships and providing excellent services throughout all phases of development.

Albany Bahamas

L & S’s core team has been involved with the design and construction of the Albany Bahamas project since 2006. We pride ourselves on building lasting relationships and providing excellent services throughout all phases of development.

Hiawassee Road Force Main Rehab   The L & S Design and Sub-Surface Utility Team provided a specific purpose survey including topographic apparent right of way, sub-surface utility designation and test holes for the City of Orlando project.

Hiawassee Road Force Main Rehab

The L & S Design and Sub-Surface Utility Team provided a specific purpose survey including topographic apparent right of way, sub-surface utility designation and test holes for the City of Orlando project.

Cape Canaveral National Cemetery   L & S provided survey control, construction surveying, GIS inventories and high resolution aerial imagery for this challenging 3 year contract.  Every tree, shrub, sprinkler head and burial crypt had to be inventoried with all required attributes for the site specific GIS system.

Cape Canaveral National Cemetery

L & S provided survey control, construction surveying, GIS inventories and high resolution aerial imagery for this challenging 3 year contract.

Every tree, shrub, sprinkler head and burial crypt had to be inventoried with all required attributes for the site specific GIS system.

Omaha National Cemetery   GIS inventories of the newly constructed National Cemetery

Omaha National Cemetery

GIS inventories of the newly constructed National Cemetery

Barbuda   L & S was commissioned to perform a topographic survey of 2,800 acres of land immediately after Hurricane Irma passed over the island. A team of four camped on island for 6 months with no running water and only a generator to keep the batteries charged. Utilizing tidal gauges to establish a vertical datum, unmanned aerial vehicles to produce high resolution imagery and topographic data and RTK GPS to establish survey control.

Barbuda

L & S was commissioned to perform a topographic survey of 2,800 acres of land immediately after Hurricane Irma passed over the island. A team of four camped on island for 6 months with no running water and only a generator to keep the batteries charged. Utilizing tidal gauges to establish a vertical datum, unmanned aerial vehicles to produce high resolution imagery and topographic data and RTK GPS to establish survey control.

Horizon West Phase I   The L & S Design Team provided a boundary, topographic, tree and wetland survey for the 250 acre Orange County project.

Horizon West Phase I

The L & S Design Team provided a boundary, topographic, tree and wetland survey for the 250 acre Orange County project.